
Stretch Georgette SAKURA Flare Dress with Bell Sleeves
SGD $1,039
SAKURA Ink Black / Size 7
- SAKURA Ink Black / Size 7
- SAKURA Ink Black / Size 9
- SAKURA Ink Black / Size 11
- SAKURA Ink Black / Size 13
- SAKURA Ink Black / Size 15
- SAKURA Cherry Blossom Pink / Size 7
- SAKURA Cherry Blossom Pink / Size 9
- SAKURA Cherry Blossom Pink / Size 11
- SAKURA Cherry Blossom Pink / Size 13
- SAKURA Cherry Blossom Pink / Size 15
- SAKURA Sky Blue / Size 7
- SAKURA Sky Blue / Size 9
- SAKURA Sky Blue / Size 11
- SAKURA Sky Blue / Size 13
- SAKURA Sky Blue / Size 15
- SAKURA Mugwort Green / Size 7
- SAKURA Mugwort Green / Size 9
- SAKURA Mugwort Green / Size 11
- SAKURA Mugwort Green / Size 13
- SAKURA Mugwort Green / Size 15

A special piecefor the modern woman
SAKURA, symbolizing the beauty of WABISABI. Developed as an elegant dress for the modern woman, zipped up with ease. This special dress inspired by visiting wear offers outstanding functionality.

Incredibly soft and flexible stretch georgette
Stretch georgette is incredibly flexible for all-day comfort. Silky, smooth, with no transparency or wrinkle worries, ideal for long wear.

Machine washable and wrinkle-free
Time-saving washability: fully machine washable. Rolls up easily for travel and business trips. Carefully crafted material lets busy women transform effortlessly.

S-curve pattern dyeing and sewing techniques for an alluring effect
Each part is dyed and assembled like a kimono to create a 3D art. The weeping cherry blossom is arranged in an S-curve for a slender, alluring, and flattering look.

Intricate print born from Kyoto Yuzen techniques
Original print co-developed with a textile manufacturer born from a Kyoto kimono wholesaler with a 150-year history. Skillfully dyed in Kyoto, combining traditional kimono patterns with modern dress designs.





























